Docs/PDFs
Electric Utility
- Rate Schedule EV-1.pdf
- Rate Schedule_GS-1.pdf
- Rate Schedule_GS-2.pdf
- Rate Schedule_GS-3.pdf
- Rate Schedule_GS-4.pdf
- Rate Schedule_GS-5.pdf
- Rate Schedule_GS-6.pdf
Electric Utility Application
Port of Stockton Utility Application
CAISO Cluster 16 Selection Criteria
CAISO LSE Commercial Cluster 16 (C16) Selection Criteria Form | Port of Stockton
Renewable Electric Generation (Solar)
- Renewable Electric Generation Workshop 10-3-23
- Public Hearing Notice and Resolution for Renewable Electric Generation
- Port Net Energy Metering (NEM) Rate Schedule (up to 200kW)
- Port Net Energy Metering (NEM) Interconnection Agreement (up to 200kW)
- Port Eligible Renewable Generation (ERG) Rate Schedule (above 200kW)
- Port Eligible Renewable Generation (ERG) Interconnection Agreement (above 200kW)
- Port Eligible Renewable Generation (ERG) Interconnection Standards and Guidelines
Tenant Resources
Tenant Contact Information Form
Documents Archive
Click on a document below to download the PDF or RTF to download the rich text version.
Business / Resources
BayoTech, Inc. – Proposed Lease No. 2024-06
Ordinance 262 – Republished 7/5/2024
BayoTech, Inc. 2024 – Draft Lease
Ordinance 262 – Published 6/7/2024
New Cingular Wireless PCS LLC 2024 – Draft Lease
Ordinance 261 – Published 2/23/2024
Sierra Logistics Center LLC
Ordinance 260 – Published 11/24/2023
Port of Stockton Utility Wildfire Mitigation Plan – FINAL
Port of Stockton Wildfire Mitigation Plan 2025 Final
Stockton Port District Resolution No. 8623-20260626
Port of Stockton Wildfire Mitigation Plan 2024-2026
Stockton Port District Resolution No. 8517-20240918
Port of Stockton Utility Wildfire Mitigation Plan.pdf
Stockton Port District Resolution No. 8381-202300803
The Port’s Utility Wildfire Mitigation Plan (WMP) was approved by the Board of Port Commissioners on May 15-2023.
Port of Stockton Independent Evaluation of Wildfire Mitigation Plan.pdf
The WMP Independent Evaluation Report is tentatively scheduled to be presented to the Board of Port Commissioners at their regularly scheduled meeting on May 15-2023.
Port Energy Efficiency Programs
- Energy Efficiency Brochure.pdf – RTF
- Energy Efficiency Program Manual.pdf – RTF
- Energy Efficiency Appendix A – Agreement.pdf – RTF
- Energy Efficiency Appendix B – Standard Fixture Watts.pdf – RTF
- Energy Efficiency Appendix C – Minimum Equipment Efficiency.pdf – RTF
- Energy Efficiency Appendix D – LED Lamps Fixtures and Qualifications.pdf – RTF
- Energy Efficiency Appendix D – Table 1 Energy Star LED Integrated Lamps.pdf – RTF
- Energy Efficiency Appendix D – Table 2 Energy Star Light Fixtures Product List.pdf – RTF
- Energy Efficiency Appendix E – Engineering Calculation Worksheet.pdf – RTF
Port Power Content Label
Port Renewable Portfolio Standard Procurement Plan
Driving Safely
2014
- 2014 Energy Efficiency Program Manual – RTF
- App A POS Agreement Writeable – RTF
- App B POS Standard Fixture Watts Final – RTF
- App C POS Min Equipment Efficiency Final
- App D POS LED Lamps Fixtures and Qualification Process Final
- App D-Table 1 Energy Star LED Integrated Lamps – RTF
- App D-Table 2 Energy Star Light Fixtures Product List Final – RTF
- App E – Engineering Calculation Worksheet Final – RTF
- Power Content Label (PCL) – RTF